Halopedia Era UNSC.png
HaloArray.png

Ütközet hydroelectric power plant: Difference between revisions

From Halopedia, the Halo wiki

m (moved Unidentified hydroelectric power plant to Ütközet hydroelectric power plant: not named in game, but works better as a description.)
No edit summary
Line 2: Line 2:
{{Ratings}}
{{Ratings}}
[[File:Halo Reach Powerhouse.jpg|thumb|250px|A view of the power plant]]
[[File:Halo Reach Powerhouse.jpg|thumb|250px|A view of the power plant]]
This '''hydroelectric power plant''' was a power facility on the [[Szurdok Ridge]] at [[Ütközet]] on planet [[Reach]]. It was one of many to provide the inhabitants of the planet with clean, sustainable energy.<ref name="power">'''[[Halo: Reach]]''', level ''[[Powerhouse]]''</ref>
The '''Ütközet hydroelectric power plant''' was a power facility on the [[Szurdok Ridge]] at [[Ütközet]] in the [[Viery Territory]] on planet [[Reach]]. It provided energy for every settlement in the territory.<ref name="power">'''[[Halo: Reach]]''', level ''[[Powerhouse]]''</ref><ref name="nightfall">'''[[Halo: Reach]]''', campaign level ''[[Nightfall]]'' ''"We dammed this river up forty-five years ago, plant powers every settlement in the territory."''</ref>


==Background==
==Background==
This power plant was located in a barren and mountainous region of Reach, on a mountain ridge overlooking a desert basin. A large river that had previously run down from the plateau to the basin had been harnessed by Reach's settlers to produce energy, with a dam constructed in a narrow canyon not far from the cliff edge. With the dam in place, most of the river's former bed below it had turned into dry land, where the power station had also been constructed. A small fraction of the river ran through the facility, down to the bottom of the basin, where the river had eroded a wide and deep canyon, which now had water only in its very bottom. The power station itself followed the general architectural direction of Reach's pioneer structures; it was composed of multiple rounded sections of structures and built mostly of concrete.<ref name="power"/>
This power plant was located in a barren and mountainous region of Reach, on a mountain ridge overlooking a desert basin. Circa 2507,<ref name="nightfall"/> a large river that had previously run down from the plateau to the basin was harnessed by Reach's settlers to produce energy, with a dam constructed in a narrow canyon not far from the cliff edge. With the dam in place, most of the river's former bed below it had turned into dry land, where the power station had also been constructed. A small fraction of the river ran through the facility, down to the bottom of the basin, where the river had eroded a wide and deep canyon, which now had water only in its very bottom. The power station itself followed the general architectural direction of Reach's pioneer structures; it was composed of multiple rounded sections of structures and built mostly of concrete.<ref name="power"/>


==Trivia==
==Trivia==
Line 15: Line 15:
File:Halo_Reach_Powerhouse_04.jpg|A view to the desert.
File:Halo_Reach_Powerhouse_04.jpg|A view to the desert.
File:Halo Reach Powerhouse 02.jpg|A power generator room inside the facility.
File:Halo Reach Powerhouse 02.jpg|A power generator room inside the facility.
Powerhouse_river.jpg|The riverbed on the bottom of the basin.
File:Powerhouse_river.jpg|The riverbed on the bottom of the basin.
</gallery>
</gallery>



Revision as of 06:10, October 21, 2010

Template:Ratings

A view of the power plant

The Ütközet hydroelectric power plant was a power facility on the Szurdok Ridge at Ütközet in the Viery Territory on planet Reach. It provided energy for every settlement in the territory.[1][2]

Background

This power plant was located in a barren and mountainous region of Reach, on a mountain ridge overlooking a desert basin. Circa 2507,[2] a large river that had previously run down from the plateau to the basin was harnessed by Reach's settlers to produce energy, with a dam constructed in a narrow canyon not far from the cliff edge. With the dam in place, most of the river's former bed below it had turned into dry land, where the power station had also been constructed. A small fraction of the river ran through the facility, down to the bottom of the basin, where the river had eroded a wide and deep canyon, which now had water only in its very bottom. The power station itself followed the general architectural direction of Reach's pioneer structures; it was composed of multiple rounded sections of structures and built mostly of concrete.[1]

Trivia

Gallery

List of appearances

Sources

  1. ^ a b Halo: Reach, level Powerhouse
  2. ^ a b Halo: Reach, campaign level Nightfall "We dammed this river up forty-five years ago, plant powers every settlement in the territory."