65,273
edits
m (Bot: Automated text replacement (-{{[ ]*[Ll]evelname[ ]*\|[ ]*(.*?)[ ]*}} +\1)) |
m (Text replacement - "{{Ref/Sources}} [[" to "{{Ref/Sources}} [[") |
||
(8 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{ | {{Status|Canon}} | ||
[[File:GWC_lines.jpg|thumb|The pipeline, running along the Tsavo Highway.]] | |||
[[File: | The '''GWC Trans-African Pipelines''', built by the [[Global Water Campaign]], are located alongside the [[Tsavo highway (location)|Tsavo Highway]] in [[Africa]] on [[Earth]]. Using the road as a route through which it carries melt water from GWC purification plants in the jungles near [[Mount Kilimanjaro]], the pipes then transport the water along the Tsavo Highway across the rest of the African continent for distribution.<ref>[http://halo.bungie.net/News/content.aspx?type=topnews&cid=13287 '''Bungie.net''': ''Ghost Town Revealed'']</ref> There are several pump houses along the way, including [[Voi Municipal Water Pump House 03]] which supplied water to the town of [[Voi]].<ref>'''Halo 3''', level ''[[Tsavo Highway]]''</ref> | ||
The '''GWC Trans-African Pipelines''', built by the [[Global Water Campaign]], are located alongside the [[Tsavo Highway]] in [[Africa]] on [[Earth]]. Using the road as a route through which it carries melt water from GWC purification plants in the jungles near [[Mount Kilimanjaro]], the pipes then transport the water along the Tsavo Highway across the rest of the African continent for distribution.<ref>[http:// | |||
==Gallery== | ==Gallery== | ||
Line 8: | Line 7: | ||
File:Pumphouse 3.jpg|Pump house 03 near Voi. | File:Pumphouse 3.jpg|Pump house 03 near Voi. | ||
</gallery> | </gallery> | ||
==List of appearances== | |||
*''[[Halo 3]]'' {{1st}} | |||
*''[[Halo 3: ODST]]'' | |||
==Sources== | ==Sources== | ||
{{Ref/Sources}} | |||
[[Category:Infrastructure]] | [[Category:Infrastructure]] |